Concrete Constructions and Technical Work Loenga — Ekebergåsen

Information

06 - Meddelande om tilldelning av kontrakt – försörjningssektorerna
Förhandlat förfarande
2018-10-09 09:35 (GMT+02:00)

Inköpare

Bane NOR SF Bane NOR SF
Arild Wabø
Postboks 4350
2308 Hamar
Norge
917 082 308

Tilldelningsinformation

The contract is for the construction of large concrete constructions. The contract consists of the following constructions: (a) Concrete tunnels for three tracks (in uncompacted matter and in rock tunnels); (b) Accompanying guideways, such as facilitating for technical railway installations; (c) 2 technical buildings with the accompanying walkable technical culvert. The constructions are to be connected to constructions built in other contracts. A section of the concrete tunnel is to be built with the principle “top-down”, where the roofing slate has already been cast and the contractor must complete the construction with concrete work that is carried out under a roofing sheet, with the restrictions this imposes on the work. The contractor must also construct several culvert sections with a traditional “cut and cover” construction method, with a floor, walls and roof. In addition, a concrete culvert is to be constructed inside a ready blasted tunnel. The contractor must also construct two technical buildings and a walkable concrete culvert. Backfilling between the sheet piling and the ready cast constructions, as well as other minor work.

Mercell Commerce

Del av Mercellgruppen, en av Europas ledande leverantörer av elektroniska upphandlings- och anbudssystem på den professionella marknaden.

Kontakta oss

Klicka här för att gå till vår support

+46 077 144 02 00
Mercell Commerce | Lindhagensgatan 94, 11218 Stockholm, Sverige