Concrete Constructions and Technical Work Loenga — Ekebergåsen

Hange

06 - Contract award notice - utilities
Läbirääkimistega menetlus
09.10.2018 10:35 (GMT+03:00)

Hankija

Bane NOR SF Bane NOR SF
Arild Wabø
Postboks 4350
2308 Hamar
Norra
917 082 308

Eesmärk

The contract is for the construction of large concrete constructions. The contract consists of the following constructions: (a) Concrete tunnels for three tracks (in uncompacted matter and in rock tunnels); (b) Accompanying guideways, such as facilitating for technical railway installations; (c) 2 technical buildings with the accompanying walkable technical culvert. The constructions are to be connected to constructions built in other contracts. A section of the concrete tunnel is to be built with the principle “top-down”, where the roofing slate has already been cast and the contractor must complete the construction with concrete work that is carried out under a roofing sheet, with the restrictions this imposes on the work. The contractor must also construct several culvert sections with a traditional “cut and cover” construction method, with a floor, walls and roof. In addition, a concrete culvert is to be constructed inside a ready blasted tunnel. The contractor must also construct two technical buildings and a walkable concrete culvert. Backfilling between the sheet piling and the ready cast constructions, as well as other minor work.

Mercell Estonia OÜ

Mercelli gruppi kuuluv Euroopa juhtiv e-hanke keskkond vahendab infot ostjate ja tarnijate vahel.

Kontakt

Mercell Eesti kasutajatugi

+372 683 6785
Mercell Estonia OÜ | Põhja puiestee 21C, 10143 Tallinn, Eesti