Førdepakken (the Førde package), Measure 17 Kletten Foot and Cycle Tunnel

Information

03 - Meddelande om tilldelning av kontrakt
Öppet förfarande
2021-05-26 09:42 (GMT+02:00)

Inköpare

Statens vegvesen Statens vegvesen
Kristine Hamre
Postboks 1010 Nordre Ål
2605 Lillehammer
Norge
971032081

Tilldelningsinformation

The measure includes approx. 590 m foot and cycle path. Approx. 440 m of this is through a new foot and cycle tunnel, and altogether 150 m connection to the existing foot and cycle path in the north west at Bergeum and south east at Førdesida. The foot and cycle path will be 3.5 m wide, including 2 x 0.25 m grass shoulder. The foot and cycle tunnel will be built according to tunnel cross-section T 5.5 in order to give space for the cycle path and foot path. 2.5 m cycle path and 1.5 m foot path separated by non-resistant kerbstones and 2 x 0.25 m shoulder. Deviations have been applied for and granted from requirements for cross-rivets in N500.

Mercell Commerce

Del av Mercellgruppen, en av Europas ledande leverantörer av elektroniska upphandlings- och anbudssystem på den professionella marknaden.

Kontakta oss

Klicka här för att gå till vår support

+46 077 144 02 00
Mercell Commerce | Lindhagensgatan 94, 11218 Stockholm, Sverige