E39 the Jernfjell and Skrikeberg tunnel Tunnel Upgrade

Informasjon

03 - Kontraktstildeling
Konkurranse med forhandling
26.01.2022 09.43 (GMT+01:00)

Innkjøper

Statens vegvesen Statens vegvesen
Helge Førland
Postboks 1010 Nordre Ål
2605 Lillehammer
Norge
971032081

Tildelingsinformasjon

Upgrade of electrical and control engineering installations, site and construction engineering as well as traffic flow in the Jernfjell and Skrikeberg tunnel. The Jernfjell tunnel is 2,391 metres long and was opened in 1989. Tunnel profile:T8 Free height 4.5 metres Width: 2 x 2.9 m (driving lane width) Max gradient: 8.0 % Speed limit 80 km/h ADT (Average annual daily traffic): 2,000 Portion of heavy traffic: 16% The Skrikeberg tunnel is 1,508 metres long and was opened in 1990. Tunnel profile:T8 Free height 4.5 metres Width: 2 x 2.95 m (driving lane width). Max gradient: 1.0 %. Speed limit 80 km/h ADT (Average annual daily traffic): 1,800. Portion of heavy traffic: 16%

Mercell Norge AS

Del av Mercell-gruppen, en av Europas ledende leverandører av elektroniske anbudsverktøy og informasjon mellom innkjøpere og leverandører i det profesjonelle markedet.

Kontakt oss

Klikk her for å gå til support

+47 21 01 88 00