E39 the Jernfjell and Skrikeberg tunnel Tunnel Upgrade

Hankinnan yleistiedot

03 - Ilmoitus tehdystä sopimuksesta (3)
Tarjousperusteinen neuvottelumenettely
26.1.2022 10.43 (GMT+02:00)

Hankintayksikkö

Statens vegvesen Statens vegvesen
Helge Førland
Postboks 1010 Nordre Ål
2605 Lillehammer
Norja
971032081

Hankintapäätös

Upgrade of electrical and control engineering installations, site and construction engineering as well as traffic flow in the Jernfjell and Skrikeberg tunnel. The Jernfjell tunnel is 2,391 metres long and was opened in 1989. Tunnel profile:T8 Free height 4.5 metres Width: 2 x 2.9 m (driving lane width) Max gradient: 8.0 % Speed limit 80 km/h ADT (Average annual daily traffic): 2,000 Portion of heavy traffic: 16% The Skrikeberg tunnel is 1,508 metres long and was opened in 1990. Tunnel profile:T8 Free height 4.5 metres Width: 2 x 2.95 m (driving lane width). Max gradient: 1.0 %. Speed limit 80 km/h ADT (Average annual daily traffic): 1,800. Portion of heavy traffic: 16%

Mercell Suomi Oy

Osa Mercell-ryhmää, Euroopan johtavaa hankintapalvelujen sekä sähköisen kilpailutusjärjestelman tuottajaa.

Yleistä hankinnoista

Hankintalaki
TED

Yhteydenotto

Klikkaa tästä asiakaspalveluun

+358 207 528 600