E39 the Jernfjell and Skrikeberg tunnel Tunnel Upgrade

Information

03 - Bekendtgørelse om indgåede kontrakter
Udbud med forhandling
26-01-2022 09:43 (GMT+01:00)

Indkøber

Statens vegvesen Statens vegvesen
Helge Førland
Postboks 1010 Nordre Ål
2605 Lillehammer
Norge
971032081

Tildelingsinformationer

Upgrade of electrical and control engineering installations, site and construction engineering as well as traffic flow in the Jernfjell and Skrikeberg tunnel. The Jernfjell tunnel is 2,391 metres long and was opened in 1989. Tunnel profile:T8 Free height 4.5 metres Width: 2 x 2.9 m (driving lane width) Max gradient: 8.0 % Speed limit 80 km/h ADT (Average annual daily traffic): 2,000 Portion of heavy traffic: 16% The Skrikeberg tunnel is 1,508 metres long and was opened in 1990. Tunnel profile:T8 Free height 4.5 metres Width: 2 x 2.95 m (driving lane width). Max gradient: 1.0 %. Speed limit 80 km/h ADT (Average annual daily traffic): 1,800. Portion of heavy traffic: 16%

Mercell A/S

En del af Mercell, en af Europas ledende aktører inden for formidling af information mellem indkøber og leverandør på det professionelle marked. CVR nr. 25698851

Kontakt

Klik her for at gå til support

+45 63 13 37 00
Mercell A/S | B!NGS
Vesterbrogade 149
, 1620 København V, Danmark