New Superstructure, E6 Northbound

Information

02 - Meddelande om upphandling
Öppet förfarande
2019-02-01 09:34 (GMT+01:00)
2019-03-20 12:00

Inköpare

Statens vegvesen Statens vegvesen
Heidi Egge
Postboks 6706 Etterstad
0609 Oslo
Norge
971 032 081

Anbudsfristen har passerat.

Kort beskrivning

In 1989, the E6 was newly constructed as 2 and 3 lanes with a concrete road surface between Jessheim Nord to Mogreina in Ullensaker municipality. Between 2007 and 2009, the E6 was expanded to 4 lanes between Hovinmoen and Dal, approx. 10 km. Some of the concrete road surface was then removed, however, it was decided to not replace 6,6 km of what is currently northbound lanes. The southbound lanes were constructed according to applicable standards with asphalted road surface. Since then, the concrete road surfaces has fissured significantly. Therefore, it requires improvement. Current superstructure requirements are stricter than when the road was built in 1989. This means the trough must be made deeper than the current trough, and a new superstructure must be built.

Mercell Commerce

Del av Mercellgruppen, en av Europas ledande leverantörer av elektroniska upphandlings- och anbudssystem på den professionella marknaden.

Kontakta oss

Klicka här för att gå till vår support

+46 077 144 02 00
Mercell Commerce | Lindhagensgatan 94, 11218 Stockholm, Sverige