County road 243 the Crossing of Sifjorden.

Information

Öppet förfarande
2017-08-23 09:29 (GMT+02:00)
2017-10-11 13:00

Inköpare

Statens vegvesen Region nord Statens vegvesen Region nord
Bjørn Lauransen
Kirkeveien 1A
9300 Finnsnes
Norge
971 032 081

Anbudsfristen har passerat.

Kort beskrivning

The project includes construction works for a new road connection over Sifjorden. The masses shall be blasted and transported from a side gravel pit at the farther end of fjord and be deposited in the sea filling. The first layer of masses shall be deposited by using seagoing equipment to contour line — 20 metres. The remaining masses shall be deposited by using on shore excavators Masses shall be deposited from both sides of the fjord due to the construction of a 45 metres bridge in the middle of the fjord. The bridge construction works are not included in this tender contest.

The current road from the side gravel pit up to Sifjord shall be upgraded. The sea filling over the fjord shall be concluded by a levelling course above the subbase.

Main quantities:

Blasting, side gravel pit, approx 340 000 pfm3

Initial masses for sea filling, approx. 80 000 m3

Blasted stones in the sea filling, approx. 545 000 pam3

The list is not exhaustive.

Mercell Commerce

Del av Mercellgruppen, en av Europas ledande leverantörer av elektroniska upphandlings- och anbudssystem på den professionella marknaden.

Kontakta oss

Klicka här för att gå till vår support

+46 077 144 02 00
Mercell Commerce | Lindhagensgatan 94, 11218 Stockholm, Sverige