E16 Eggemoen - Olum, Relieved road Verkevika - Toso

Information

02 - Meddelande om upphandling
Förhandlade förfaranden under konkurrens
2023-01-10 09:28 (GMT+01:00)
2023-02-07 12:00

Inköpare

Statens vegvesen Statens vegvesen
Heidi Havelin Egge
Skoggata 19
1500 Moss
Norge
971032081

Anbudsfristen har passerat.

Kort beskrivning

As part of the E16 Eggemoen – Olum project, the original E16, which goes past central Jevnaker and through Toso, is being down-classified. In connection with this down-classification, the stretch will be upgraded, with measures to emphasise traffic for soft road users, rather than through traffic. The project includes the following measures: • Raised pavement along the fjord on the north side of the road • Improved pavement along the south side of the road • Smaller lanes • A canteen stop for busses • Raised pedestrian crossing • Lowered roadway under the railway • Passable roundabout • New and traffic-safe access to Hadeland Glassworks • New lighting (one-sided lighting except along Verkevika where there is 2-sided lighting) • Aesthetic enhancement: furnishings, landscaping, curbstones and granite paving • Improve the stormwater problem in the planning area for PlanID 82 • Prepare the conditions for traffic management in relation to the current intersection between Hadelandsvegen and Glassverksvegen

Mercell Commerce

Del av Mercellgruppen, en av Europas ledande leverantörer av elektroniska upphandlings- och anbudssystem på den professionella marknaden.

Kontakta oss

Klicka här för att gå till vår support

+46 13 39 00 32 0
Mercell Commerce | Klara Södra kyrkogata 1, 11152 Stockholm, Sverige