County Road 110 Foot/Cycle Path Begby-Borge

Information

03 - Meddelande om tilldelning av kontrakt
Öppet förfarande
2019-11-04 09:35 (GMT+01:00)

Inköpare

Statens vegvesen Statens vegvesen
Vigdis A Holter
Postboks 6706 Etterstad
0609 Oslo
Norge
971032081

Tilldelningsinformation

A foot and cycle path shall be construction from the roundabout Begby to Borge school. The road must be subject to pavement widening and shall partly be constructed in a new curve from profile 0 at the roundabout to profile 1 000. The road shall also be constructed outside of the burial ground as a new road from approximately profile 1 000 to approximately profile 1 800. The project is a design-based project. Contracts shall not be transferred. The road works shall be initiated from summer 2019 until completion during the early summer 2021. A new foot and cycle culvert shall be constructed in the crossing County Road 113 — Borgeveien. Water and sewer pipes and cables, as well as street lights shall be established along the entire section. The crossing County Road 110 x 532 must be renovated at the end of the section, approx. Profile 2 800.

Mercell Commerce

Del av Mercellgruppen, en av Europas ledande leverantörer av elektroniska upphandlings- och anbudssystem på den professionella marknaden.

Kontakta oss

Klicka här för att gå till vår support

+46 077 144 02 00
Mercell Commerce | Lindhagensgatan 94, 11218 Stockholm, Sverige