Trondheim Airport — Consultant Group for a New Terminal Solution (k-189063)

Informasjon

05 - Kunngjøring av konkurranse - forsyningssektoren
Konkurranse med forhandling
21.11.2019 09.39 (GMT+01:00)
18.12.2019 12.00

Innkjøper

Avinor AS Avinor AS
Lars Vegard Kjærstad
PB 150
2061 Gardermoen
Norge
985198292

Dato for innlevering er passert

Kort beskrivelse

Trondheim airport Værnes has for a long period had capacity problems for BHS [the Main Sorting Hall] The sorting of passengers is divided between 2 halls, one of which (international passengers) the sorting is handled manually. There are also significant HSE challenges in the main sorting hall (BHS) as this hall is narrow and has very low ceiling height (some maintenance platforms have a working height of down to one metre). There is no room for the packing/loading of aircraft containers. Large arrivals/departures, particularly during winter seasons with a lot of odd luggage, are sorted outdoor. The expansion includes the construction of a new BHS with capacity for handling domestic and international arrivals and departures up until 2035.

Mercell Norge AS

Del av Mercell-gruppen, en av Europas ledende leverandører av elektroniske anbudsverktøy og informasjon mellom innkjøpere og leverandører i det profesjonelle markedet.

Kontakt oss

Klikk her for å gå til support

+47 21 01 88 00