Etterstad sixth form college — new canteen kitchen and various alterations

Hange

Avatud menetlus
21.04.2018 10:18 (GMT+03:00)
01.06.2018 12:00

Hankija

Oslo kommune v/ Undervisningsbygg Oslo KF Oslo kommune v/ Undervisningsbygg Oslo KF
Tove Godejord
Postboks 6473 Etterstad
0605 Oslo
Norra
984 070 659

Hange on lõppenud

Hanke lühikirjeldus

Etterstad sixth form college shall be totally renovated and the number of pupils is to be expanded from 766 to 1126 by the end of 2023. This contract is for the required preparatory work before building E can be demolished.

The college consists of 5 buildings. Building A shall have minor alterations (option). Building B shall have dry coolers on the roof. The walls are to be demolished and a new canteen kitchen is to be constructed in buildings C/D. A cooling machine and ventilation aggregate shall be established for the canteen in building D. The gym with an aggregate is to be moved. The work shall be carried out whilst the college is fully operational.

Mercell Estonia OÜ

Mercelli gruppi kuuluv Euroopa juhtiv e-hanke keskkond vahendab infot ostjate ja tarnijate vahel.

Kontakt

Mercell Eesti kasutajatugi

+372 683 6785
Mercell Estonia OÜ | Põhja puiestee 21C, 10143 Tallinn, Eesti