E6 Nordby tunnel southbound lanes — procurement of SRO installations with assembly.

Hange

Avatud menetlus
17.11.2016 10:45 (GMT+02:00)
06.01.2017 12:00

Hankija

Statens vegvesen Region øst [The Norwegian Public Roads Administration, Eastern Region] Statens vegvesen Region øst [The Norwegian Public Roads Administration, Eastern Region]
Bjørn Moholt
Postboks 1010
2605 Lillehammer
Norra
971032081

Hange on lõppenud

Hanke lühikirjeldus

Nordby tunnel shall be renovated and two-way traffic shall be established in the

southbound lanes. Local SRO installations, speed limit signs, signs for

oncoming traffic, cables, other material shall be delivered, as well as assembly, installation, programming and commissioning. The work will be carried out on and by a busy road. This means that night work must be priced.

The objective of the procurement is:

When the work is carried out in the northbound lanes, the southbound lanes shall have 2-way traffic. All

installations are in the southbound lanes. The installations shall have two scenarios, normal traffic in all the tunnel lanes and two-way traffic in the southbound lanes.

Mercell Estonia OÜ

Mercelli gruppi kuuluv Euroopa juhtiv e-hanke keskkond vahendab infot ostjate ja tarnijate vahel.

Kontakt

Mercell Eesti kasutajatugi

+372 683 6785
Mercell Estonia OÜ | Põhja puiestee 21C, 10143 Tallinn, Eesti