Ramfoss Power Plant — Renovation of turbines.

Hange

Läbirääkimistega menetlus
28.06.2016 10:56 (GMT+03:00)
19.08.2016 12:00

Hankija

Ramfoss Kraftlag Ramfoss Kraftlag
Odd Røvang Odd Røvang
Øvre Nedmarken 15
3370 Vikersund
Norra
971030690

Hange on lõppenud

Hanke lühikirjeldus

Ramfoss Power Plant is equipped with 3 Francis turbines from 1960 and 1970 (P = 10 MW, H = 22,5 m, Q = 50 m3/s and n = 150 rpm). The turbines shall be renovated and services for complete renovation of all 3 turbines shall be procured.

Possibly installation of new runners as a part of the renovation contract will be considered during the process. Option prices for new runners will therefore be a part of the procurement process.