National Road 77, The Tjernfjell tunnel, Crossing E6 — Solvågli.

Hange

Avatud menetlus
02.06.2016 10:38 (GMT+03:00)
11.07.2016 12:00

Hankija

Statens vegvesen Region nord (The Norwegian Public Roads Administration, Region North) Statens vegvesen Region nord (The Norwegian Public Roads Administration, Region North)
the site office for Project Salten the site office for Project Salten
Grete Livik
Dreyfushammarn 31/33
8002 Bodø
Norra
971032081

Hange on lõppenud

Hanke lühikirjeldus

The project national road 77 the Tjernefjell tunnel includes tunnel works and portals, as well as some roadworks on both side of the tunnel. The length of the tunnel is 3 230 metres and shall be constructed in accordance with class B, with a cross section of T9,5.

At the Junkerdal side a cutting and 480 metres road shall be constructed as a connection to the existing national road 77.

At the Saltdal side the national road 77 will have a section in open air. The length of this section is 490 metres with a crossing connection to the E6. The E6 shall be reconstructed on an 800 metre long section on both side of this crossing A road connected to the old national road 77 shall also be constructed.

Masses shall be laid in the road embankment and the ground shall be levelled for the future E6. The masses shall also be placed in a deposit in Junkerdalen, Lønsdal and at the left tunnel portal on the Saltdal side.

Mercell Estonia OÜ

Mercelli gruppi kuuluv Euroopa juhtiv e-hanke keskkond vahendab infot ostjate ja tarnijate vahel.

Kontakt

Mercell Eesti kasutajatugi

+372 683 6785
Mercell Estonia OÜ | Põhja puiestee 21C, 10143 Tallinn, Eesti