Upgrade of Traction Converters (PEC Modules) in FLIRT Trainsets

Hange

Ei ole määratletud
05.12.2025 7:13 (GMT+02:00)
04.12.2025 12:00 (GMT+02:00)

Hankija

NORSKE TOG AS NORSKE TOG AS
Gunnar Glomlien Gunnar Glomlien
Norra
917445060

Hange on lõppenud

Hanke lühikirjeldus

Norske tog AS owns and manages a fleet of FLIRT trainsets (types 74, 75, and 76) delivered by Stadler Rail between 2012 and 2023. Most of the fleet (types 74 and 75) uses traction converters with PEC2 microprocessor cards from ABB/Hitachi, which have been declared end-of-life as of 31 December 2023. This will gradually reduce repair and spare part availability, increasing the risk of operational disruptions and higher maintenance costs. The newer type 76 trainsets use PEC3 modules, which are not considered critical for replacement at this time.

The PEC module is a key component of the traction converter, controlling power delivery to the train’s traction motors and auxiliary systems. The design and software are proprietary to ABB/Hitachi, and the vehicle control system can only be modified by Stadler. Any upgrade must ensure full compatibility with existing systems and safety requirements.

Norske tog is considering a fleet-wide upgrade from PEC2 to a newer platform (e.g., PEC4) to ensure long-term reliability and cost-effectiveness. While we believe this may be a task best suited for the original manufacturer or supplier, Norwegian procurement regulations require us to investigate whether alternative suppliers or solutions exist. This RFI is for information gathering only.

All input will be considered in the further planning process.

Hankele lisatud dokumendid

Dokumendi nimi Faili suurus
RFI Questionnaire.docx 74 KB
Request for Information - PEC.pdf 149 KB

Mercell Estonia OÜ

Mercelli gruppi kuuluv Euroopa juhtiv e-hanke keskkond vahendab infot ostjate ja tarnijate vahel.

Kontakt

Mercell Eesti kasutajatugi

+372 683 6785
Mercell Estonia OÜ | Põhja puiestee 21C, 10143 Tallinn, Eesti