Hanke lühikirjeldus
The aim of the procurement is to cover the New Water Supply Oslo project's need for a tenderer that can handle approx. 1,210,000 tonnes of matter produced by the tunnel drilling machine (hereafter callee TBM matter) from the E6 Clean Water Tunnel, with an option for up to 560,000 TBM matter from the contract E5 Raw Water Tunnel. The TBM matter can be handed by the tenderer in the form of disposing of the matter, further processing of the matter, or use of the matter for restoring land areas.
The amounts include approx. 5-8 weight percentage with water in each lot. VAV will transport the TBM matter to a landfill site via a contractor.