Baltic Pipe Onshore — Works for Tie-ins

Hange

05 - Contract notice - utilities
Läbirääkimistega menetlus
15.01.2021 12:26 (GMT+02:00)
08.02.2021 12:00

Hankija

Energinet Gas TSO A/S Energinet Gas TSO A/S
Rikke Sadolin
Tonne Kjærsvej 65
7000 Fredericia
Taani
39315084

Hange on lõppenud

Hanke lühikirjeldus

All activities required to complete the work in accordance with the contract necessary for tie-in operations in connecting the new constructed onshore pipelines both between the individual construction parts and connection to the existing transmission system are separated in different types of tie-in: in particular this includes, but is not limited to, the following: — Tie-in to the existing system being in operation. This means that a separation typically consists of one valve. Energinet will here check the tightness of the valve before the operation is carried out. — Tie-in to the existing system in operation but separated with two valves and nitrogen filling between the two valves. — Tie-in between two newly constructed sections with no connection to gas system in operation. Here the sections may be delivered with a slight overpressure of nitrogen or dry air. This is subject for check before the tie-in operation starts.

Mercell Estonia OÜ

Mercelli gruppi kuuluv Euroopa juhtiv e-hanke keskkond vahendab infot ostjate ja tarnijate vahel.

Kontakt

Mercell Eesti kasutajatugi

+372 683 6785