E39 the Jernfjell and Skrikeberg tunnel Tunnel Upgrade

Information

03 - Contract award notice
Competitive procedure with negotiation
1/26/2022 9:43 AM (GMT+01:00)

Buyer

Statens vegvesen Statens vegvesen
Helge Førland
Postboks 1010 Nordre Ål
2605 Lillehammer
Norway
971032081

Assignment text

Upgrade of electrical and control engineering installations, site and construction engineering as well as traffic flow in the Jernfjell and Skrikeberg tunnel. The Jernfjell tunnel is 2,391 metres long and was opened in 1989. Tunnel profile:T8 Free height 4.5 metres Width: 2 x 2.9 m (driving lane width) Max gradient: 8.0 % Speed limit 80 km/h ADT (Average annual daily traffic): 2,000 Portion of heavy traffic: 16% The Skrikeberg tunnel is 1,508 metres long and was opened in 1990. Tunnel profile:T8 Free height 4.5 metres Width: 2 x 2.95 m (driving lane width). Max gradient: 1.0 %. Speed limit 80 km/h ADT (Average annual daily traffic): 1,800. Portion of heavy traffic: 16%

Mercell Holding AS

Part of the Mercell Group, one of Europe’s leading providers of e tender systems and information between buyers and suppliers in the professional market.

Contact us

Write to us

+47 21 01 88 00