Piedāvājumu iesniegšanas termiņš ir beidzies.
Energinet.dk wants to purchase one smoothing reactor.
The HVDC link KontiSkan 2 delivered from ABB Ludvika 1987 was supplied with a spare Spezielektra smoothing reactor. This spare reactor has been stored outdoors in the station yard for three decades without protection against harsh weather condition. The reactor is now degraded in a way Energinet.dk is forced to replace it.
The scope of this tender is to puchase a spare reactor without support insulators. The new reactor has to be similar as the existing reactor, with similar dimension and functions.
Piesakieties Mercell un saņemiet paziņojumus par jaunākajiem iepirkumiem sev svarīgajās nozarēs 7 dienas bez maksas!