Electrical installations.

Information

Negotiated procedure
30.05.2014 04:37 (GMT+02:00)
25.06.2014 12:00

Buyer

Actus Rådgivning AS993274992 Actus Rådgivning AS993274992
Harald Lindberg
PB 254
4097 Sola
Norway

Closing date has passed.

Short description

Avinor AS shall extend the terminal building at Stavanger Airport Sola with approx. 2700 m². About 950 m² is an extension and reconstruction of the ground floor baggage system area, approx. 1.290 m² for passengers and commercial use in 1st floor and the rest is allocated to technical equipment rooms. The baggage sorting system and passenger area is located airside and residue areas on landside. The construction work is being performed while the airport is in operation.

The scope of this contract comprises the complete site installation work including, but not limited to:

— Electrical installations including switches, tracing, supports, cabling, general el. installations and lightning.

— Tele and IT/IS installations, - i.e.: data network cabling, curriculum and courses for access control system, extension of current PA-system and Fire alarm system incl. speaker alerts.

The contract is planned to be awarded primo September 2014 . Preliminary execution timeline is 1.10.2014 to 1.5.2015.

The contract will include an optional additional delivery of up to 100 % of the initial contract value. A potential extension is planned to be executed in sequential phases. In summary, - this contract comprises the first phase airport extension (TUSO) + optional reconstruction of commercial areas all preparatory works for the first next phase (USO T1).

Mercell Holding AS

Part of the Mercell Group, one of Europe’s leading providers of e tender systems and information between buyers and suppliers in the professional market.

Contact us

Write to us

+47 21 01 88 00