Etterstad sixth form college shall be totally renovated and the number of pupils is to be expanded from 766 to 1126 by the end of 2023. This contract is for the required preparatory work before building E can be demolished.
The college consists of 5 buildings. Building A shall have minor alterations (option). Building B shall have dry coolers on the roof. The walls are to be demolished and a new canteen kitchen is to be constructed in buildings C/D. A cooling machine and ventilation aggregate shall be established for the canteen in building D. The gym with an aggregate is to be moved. The work shall be carried out whilst the college is fully operational.