Pasiūlymų pateikimo terminas praėjo.
The project is located in Tromsøya in Tromsø. The works in this contract comprise clearing existing water and sewage pipelines in Gulenvegen and Kræmerbakken as well as connections to existing water and sewage installations in adjoining roads. New water and sewage installations involve handling surface water (OV) from overlying areas.
The total length of the establishment of the new pipeline installations in existing road ground is approx. 740 metres.
The pipeline installations shall be separated for surface water and waste water and the fall directions and extent will alter from the current pipeline network. The new water pipeline network for Gulengvegen and Aldor Ingebrigtsensveg will be divided with different pressure zones.
The new sewage pipeline network in Gulengvegen and Aldor Ingebrigtsensven cut through 7 existing municipal water and sewage pipelines on private property in the area. The total length of clearing of these pipeline draws is approx. 270 meters.
The clearance in Kræmerbakken includes the establishment of an OPI channel of approx. 120 metres from Stakkevollvegen to Aldor Ingebrigtsens veg.
The Contracting Authority uses Mercell Sourcing Service. To express your interest and gain access to any documents, please click on the link below or copy and paste the link into your browser. [[http://permalink.mercell.com/45642094.aspx]]. Then follow the instructions on the website.