Market dialogue Bornholm Energy Islands - Cables

Informācija

04 - Periodic indicative notice - utilities
Nav
03.05.2023 11:00 (GMT+03:00)

Pasūtītājs

Energinet Eltransmission A/S Energinet Eltransmission A/S
Sara Elbek Westerberg
Tonne Kjærsvej 65
7000 Fredericia
Dānija
39314878

Lai saņemtu informāciju par iepirkumiem e-pastā, piesakieties, spiežot uz "Saņemt iepirkumu informāciju" lapas lejasdaļā!

The Danish Folketing (The Danish Parliament) has decided to construct two energy islands in Denmark – in the North Sea and in the Baltic Sea. The energy island on Bornholm will have a capacity of 3 GW, while the one in the North Sea will have a capacity of 3 GW in 2033, and 10 GW in the longer term. For the Bornholm Energy Island project, neighbouring transmission system operators 50Hertz (Germany) and Energinet (Denmark) signed a corresponding cooperation agreement on the construction of a hybrid interconnector between the respective countries. This market dialogue is launched regarding the Bornholm Energy Island project for establishing the required cable connections from/to Bornholm.

Vēlaties saņemt visaptverošu Jūs interesējošās nozares aktuālo iepirkumu informāciju?

Piesakieties Mercell un saņemiet paziņojumus par jaunākajiem iepirkumiem sev svarīgajās nozarēs 7 dienas bez maksas!

SIA Mercell Latvia

Daļa no Mercell grupas – viens no vadošajiem e-iepirkumu platformu un iepirkumu informācijas piegādātājiem Eiropā.

Par uzņēmumu

Par mums
Kontakti

Sazinaties ar mums

Spiediet šeit, lai dotos uz atbalsta lapu

+371 22720771
SIA Mercell Latvia | Dzirnavu iela 37-43, LV-1010 Rīga, Latvija