One (1) 60 MVA transformer supplying power to one electrical boiler unit (resistive load) comprising design, manufacturing, Factory Acceptance Test (FAT), delivery, transportation, on-site installation including oil-filling, commissioning and Take-Over testing (SAT) of the complete functional transformer: 132/10,5 kV, 60 MVA, (ONAN)1 cooled. The transformer must be equipped with on-load-tap-changer (OLTC). The Scope of Works include the delivery and installation of the automatically voltage regulator keeping the secondary voltages at constant voltage level. The delivery also include installation of the Transformer protection system incl. 12kV cabling and LV and Control cabling between transformer and LV switchgear and transformer protection cubical.