A new railway shall be built between Nykirke and Barkåker on the Vestfold line. The project consists of 14 km of new double tracks. The stretch will have 2 bridges, 4 tunnels (a total of 5,3 km) and a new station at Skoppum. The project also contains four assembly points and 3 escape tunnels. A concrete tunnel is being planned under E-18 at Kopstadveien, to the west of Sletterødåsen, and a rock and concrete tunnel between Skaug and Viulsrød. This contract includes all railway systems, except signalling installations.