Closing date has passed.
The scope of work includes 16 new movable Passenger Boarding bridges (PBB’s), all Apron Drives, on pier east. The scope includes, but is not limited to; detailed design, construction, installation, commissioning, and all kinds of tests, training and documentation and so on.