Short description
The project consists of re asphalting of parts of the runway, taxiway and the apron at Kristiansund Airport. The part of the runway that will be asphalted is 1 895 m long with a limit of 0.45 m, as well as the turning platform at the northern end of approx. 1 230 m
The assignment duration: April-June 2021.