Design and build contract for E18 Tvedestrand-Arendal.

Information

Verhandlungsverfahren
02.03.2016 09:30 (GMT+01:00)
08.04.2016 12:00

Buyer

Nye Veier AS Nye Veier AS
Bjørn Børseth Bjørn Børseth
Tangen 76
4608 Kristiansand
Norwegen
915 488 099

Closing date has passed.

Short description

The contract work consists of engineering and construction of the highway section E 18 Arendal — Tvedestrand.

E18 Tvedestrand — Arendal runs from Rømyr in Tvedestrand to Harebakken in Arendal. The route is approximately 23 km, and will be a four-lane highway:

— From Rømyr (the Føyheia tunnel) to the new crossing at Longum syd ( Longum south), ca. 17.5 km, the highway is being built with a 20 m width of the road, standard class H8.

— From Longum syd to Harebakken (the Torsbuåsen tunnel), ca. 3.8 km, the highway is being built with 23 m road width, standard grade H9.

— Harebakken approximately 200 m adaptation to the existing highway.

The compensation scheme will mainly be based on lump sum, some elements of reimbursable/quantity based compensation may occur. Further details concerning the compensation mechanism will be determined in the tender documents.

Mercell Germany

Part of the Mercell Group, one of Europe’s leading providers of e tender systems and information between buyers and suppliers in the professional market.

Contact us

Write to us

+47 21 01 88 60
Mercell Germany | Askekroken 11, 0277 OSLO, Norwegen