Login
Adgang til udbud
Kontakt os
Danmark
Danmark
Deutschland
Eesti
Latvija
Lietuva
Norge
Polska
Russia
Suomi
Sverige
World
UK & Ireland
USA
Nederland
България
Danmark
Danmark
Deutschland
Eesti
Latvija
Lietuva
Norge
Polska
Russia
Suomi
Sverige
World
UK & Ireland
USA
Nederland
България
Kontakt os
Login
Toggle navigation
Support
Søg udbud
Hjemmesiden
Udbud
Situation Analyses and Classification Criteria regarding Dam and Waterway Safety
Information
Bekendtgørelsestype
 
Type
eForm N16VOL-CN Norwegian national Contract or concession award notice
Procedure
 
Forventet opstart af tilbudsprocessen
Forventet slutdato for tilbudsprocessen
Offentliggørelse
13-08-2025 09:01 (GMT+02:00)
Tidsfrist
09-09-2025 12:00 (GMT+02:00)
Spørgefrist
01-09-2025 15:00 (GMT+02:00)
Anbefalet dokumentfrist
Accepterer alternative tilbud
Nej
Accepterer alternative tilbud
Nej
Indkøber
Ordregiver
Norges vassdrags- og energidirektorat (NVE)
Norges vassdrags- og energidirektorat (NVE)
Afdeling
Kontakt
Guro Haug Nilsen
Guro Haug Nilsen
Addresse
Middelthunsgate 29
0368
OSLO
Norge
CVR nr
970205039
Hjemmeside
www.nve.no
Tidsfristen er overskredet
Kort beskrivelse
The consultancy assignment is a part of a 5-year institutional cooperation (2021-2026) between Electricity Regulatory Authority of Uganda (ERA) and the Norwegian Water Resources and Energy Directorate (NVE), financed by the Norwegian Agency for Development Cooperation (Norad).
The cooperation is anchored in a program document and organized in different Cooperation Areas (CAs). This consultancy assignment, and the associated Terms of Reference, is linked to CA3.3, “Safety of Hydropower Dams and Waterways”.
CA 3.3 is implemented by ERA and the Ministry of Water and Environment, Directorate for Water Resources Management (DWRM), supported by NVE.
ERA and DWRM will develop a regulatory framework for dams and waterways safety management and a classification system for dams and waterways to improve the safety of dams and waterways to enhance the resilience of downstream communities in Uganda.
The objective of this assignment is twofold:
To map and assess the baseline situation with respect to the regulatory framework for dams and waterways safety so that ERA, DWRM and developing partners can address gaps, weaknesses and challenges well informed.
To propose dam classification criteria for dams and waterways in Uganda.
Filer
Navn
Størrelse
0 Konkurransegrunnlag.pdf
409 KB
1 Attachment 1 - Tilbudsbrev.docx
36 KB
2 Attachment 2 - Forpliktelseserklæring.docx
55 KB
3 Attachment 3 - Referansebeskrivelser.docx
48 KB
4 Attachment 4 - CV-mal.docx
37 KB
5 Attachment 5 - Taushetserklæring.pdf
419 KB
6.0 Attachment 6.0 SSA-O Assignment Agreement.pdf
550 KB
6.1 Attachment 6.1 SSA-O Appendices.docx
113 KB
6.1.1 Appendix 1.1 ToR Dam and Waterway Safety Regulations Guidelines - revised_22.06.2025.pdf
158 KB
Mercell A/S
En del af Mercell, en af Europas ledende aktører inden for formidling af information mellem indkøber og leverandør på det professionelle marked. CVR nr. 25698851
Mercell A/S
|
B!NGS
Vesterbrogade 149
,
1620
København V
,
Danmark
Privatlivspolitik
|
Cookies
|
Vilkår og betingelser
|
Kontakt os
|
Login