Flue Gas Condenser System

Information

Verhandlungsverfahren
19.06.2018 09:36 (GMT+02:00)
04.07.2018 13:00

Buyer

Turun Seudun Energiantuotanto Oy Turun Seudun Energiantuotanto Oy
Tapani Bastman
Satamatie 16
21100 Naantali
Finland
1730092-3

Closing date has passed.

Short description

Turun Seudun Energiantuotanto Oy (TSE) has built a combined heat and power unit (NA4, nominal fuel input some 430 MWfuel) in an existing power plant area, where the company already owns three coal-fired power and CHP blocks (NA1, NA2 and NA3). Energy production of the NA4 is based on wood- and agro-originated biomass, peat and coal. This supply consists of the flue gas heat recovery plant with the necessary auxiliary equipment for the NA4 power plant. The supply also includes the condensate treatment plant where raw water is produced from the condensate for the existing power plant. The annual average heat recovery of the flue gas condenser is about 40 MW and the maximum heat recovery is about 65 MW. The recovered heat will be transferred to the district heating network. The supply may contain the whole flue gas heat recovery plant with flue gas condensate treatment or only the separate flue gas heat recovery plant or only the separate flue gas condensate treatment plant.

Mercell Germany

Part of the Mercell Group, one of Europe’s leading providers of e tender systems and information between buyers and suppliers in the professional market.

Contact us

Write to us

+47 21 01 88 60
Mercell Germany | Askekroken 11, 0277 OSLO, Norwegen