Extension with 3 floors and a loft, total area 1 343 m²
Contract type: Turnkey contract
Construction period approx. October 2017 — approx. August/ September 2018.
Shall be constructed from wood — pilot project.
Smaller alteration works for the current building.
Outdoor work and some work on the existing buildings.
Option: The system for hybrid ventilation is withdrawn from the tender contest.
School in operation.
Architectural services are transferred.