Metroselskabet is constructing Cityringen and Cityringen — branch off to Nordhavnen.
Metroselskabet is now planning for Cityringen — branch off to Ny Ellebjerg via Sydhavnen.
Sydhavnsmetroen is a dual track branching off the Cityringen, starting after a bifurcation chamber located at the branch off to the Control and Maintenance Center (CMC). Sydhavnsmetroen will be a bored tunnel over the approx. first 3 500 metres, following which, over a distance of approx. 200 metres, the Sydhavnsmetroen will be taken up to ground level via a cut and cover tunnel and a ramp; finally the Sydhavnmetroen will end with approx. 500 metres of metro above ground.
5 stations will be constructed:
— v/Fisketorvet (under ground station);
— v/Frederiksholmsløbet (under ground station on the southern part of Enghave Brygge);
— v/Slusen (under ground station located on filled in material in Fordgraven);
— v/Mozarts Plads (under ground station);
— Ny Ellebjerg Station (above ground station or as an alternative a under ground station).
Furthermore Sydhavnsmetroen will be prepared for a possible extension of the M4 line after Ny Ellebjerg.
Section V: Award of contract
V.1.1) Date of contract award decision:
19.12.2014
V.1.2) Information about offers
Number of offers received: 3
V.1.3) Name and address of economic operator in favour of whom the contract award decision has been taken
Telephone: E-mail: Internet address: Cowi Systra Joint Venture, Parallelvej 2, 2800 Kongens Lyngby, DENMARK +45 56400000, cowi@cowi.dk, www.cowi.dk