Assignment text

Banedanmark requests the contractor to make a detailed design, delivery and commissioning of a new 25 kV railway substation Vigerslev in the Copenhagen area.

The existing Vigerslev substation is situated where the new railway line Copenhagen – Ringsted will run, thus necessitating a new substation. Caused by a high load on the substation and no alternative power supply, the old station must be kept in operation during construction. Both stations must be operating in parallel until all tests on the new station have been concluded.

The work consists of all necessary activities related to the establishment of the new Vigerslev substation including:

— design and build a complete 25 kV railway substation

— test and commissioning

— removal, delivery and extension of 25 kV cable system from old substation / railway transformers to new substation

Optional:

— establish an additional high voltage feeding cable in public road to a new feeding point between Vigerslev and Hvidovre Fjern stations.

The new substation shall be designed for 1x25 kV 50 Hz AC. It consists of an indoor switchgear of two (2) incoming feeders, eight (8) outgoing feeders and two (2) sectionizing cells, complete with protection and control systems, remote control, low voltage auxiliary systems, batteries etc.

All necessary tests and commissioning are to be included.

All high voltage cables and signaling cables between existing 132/25 kV transformers and existing railway substation shall be exchanged by new cables.

All high voltage feeder cables and signaling cables between existing railway substation and feeder poles shall be relocated to the new railway substation either by new cables or with extension of existing cables.

The existing railway substation shall be in service until the new one are fully tested and put into service. A provisional high voltage cable shall be laid between the two substations to secure redundancy during removal of cables.

Existing railway transformers and demolishing of existing Vigerslev substation are not a part of this contract.

Section V: Award of contract

V.1.1) Date of contract award decision:

6.12.2013

V.1.2) Information about offers

Number of offers received: 3

V.1.3) Name and address of economic operator in favour of whom the contract award decision has been taken

Bravida Danmark A/S, Park Allé 373, 2605 Brøndby, DENMARK

Mercell Holding AS

Part of the Mercell Group, one of Europe’s leading providers of e tender systems and information between buyers and suppliers in the professional market.

Contact us

Write to us

+47 21 01 88 00