Energinet.dk will very soon approach the market with tenders for one 200MW AC offshore platform and two 400 MW AC offshore platforms with additional equipment.
The tenders will include construction and installation of the substructures and topsides for all three platforms.
One 400 MW AC platform is planned to be installed in the summer 2016 at Horn Rev in the North Sea and the two other platforms is planned to be installed in the summer 2018 at Kriegers Flak in the Baltic Sea.
Expected water depths in installation areas are around 20 m.
Detailed design will be performed by Energinet.dk.