The Railway Electrification Programme - multi-disciplinary consultancy service contract.

Information

Negotiated procedure
6/28/2013 4:24 AM (GMT+02:00)

Buyer

Banedanmark Banedanmark
The Railway Electrification Programme, Banedanmark The Railway Electrification Programme, Banedanmark
Susan Bille Andersen Susan Bille Andersen
Amerika Plads 15
2100 Copenhagen
Denmark

Assignment text

Banedanmark is commencing an expansion of the catenary system for electrical trains. The current plan

provides for the installation of a catenary system in approximately 550 km of railway in four separate sections

of railway (Copenhagen - Ringsted, Ringsted - Holeby, Lunderskov – Esbjerg and Køge Nord – Næstved), with

the option of adding the installation of a catenary system in an additional approximate 800 km of railway in 5

other sections (Roskilde – Holbæk – Kalundborg, Fredericia – Aarhus, Aarhus – Aalborg (Lindholm), Aalborg (Lindholm) – Frederikshavn and Vejle - Struer).

The Railway Electrification Programme includes 1) installation of a catenary system (including masts,

foundations and geotechnical surveys), 2) installation of the necessary infrastructure to secure the power

supply from the power grid, 3) the alteration, removal and rebuilding of overpasses that do not provide sufficient

overhead space for the catenary system, 4) where necessary, electrical shielding of technical installations and

5) other alterations to the surroundings ofthe railway (e.g. removal of trees).

This contract covers multi-disciplinary consultancy services in the period from 2013 to the closing of the Railway

Electrification Programme around 2021 (or, pending the exercise of the optional sections, around 2024). The

contract includes all consultancy services necessary to carry out the total installation, such as a) preparation

of tender documents for the coming Design-Build-Maintain contracts regarding the above mentioned Nos. 1, 2

and 5 (Banedanmark plans to carry out the tenders on the basis of functional requirements), b) assistance in

carrying out the tenders and c) assistance, including supplier supervision, during the Design and Build phases.

A part of the Consultant's work will regard assisting Banedanmark with interface handling (both internal and

external interfaces between the different projects, e.g. the København – Ringsted project, the Signalling

Programme and the Fehmarnbelt Project), stakeholder management and authority management (e.g. regarding

safety approval).The Consultant will be responsible for specifying the actual content of the consultancy service

in cooperation with Banedanmark as the Railway Electrification Programme moves forward. In relation to this it

should be noted that, due to the schedule of the programme and the grouping of a number of projects into one

programme, a small part of the required consultancy work related to the Railway Electrification Programme is

already being, has been, or will be undertaken by other consultants, for instance consultants appointed in other programmes and projects. The above is only a very general description.

Section V: Award of contract

V.1.1) Date of contract award decision:

12.6.2013

V.1.2) Information about offers

Number of offers received: 5

V.1.3) Name and address of economic operator in favour of whom the contract award decision has been taken

COWI A/S/Systra SA, Parallelvej 2, 2800 Kongens Lyngby, DENMARK

Mercell Holding AS

Part of the Mercell Group, one of Europe’s leading providers of e tender systems and information between buyers and suppliers in the professional market.

Contact us

Write to us

+47 21 01 88 00