Billund Lufthavn (airport) must change the existing EDS units in the baggage handling system in order to meet the EU standard 2 regulations. For this purpose 2 new EDS units (Explosive Detection Systems) shall be built in the baggage handling system in the existing passenger terminal building. The two new EDS units shall be in operation in 2012.
The scope of work comprises of authorities approval, delivery, dismantling of existing EDS units, erection and commissioning of the 2 new EDS units. Each of the EDS units must be able to screen minimum 1 500 pieces of baggage per hour.