Short description
IVAR´s sorting facility with separate lines for sorting of residual waste and sorting of paper burned down in the summer of 2022. The plant will now be re-established.
The residual waste sorting facility will be re-established as a MRF plant located in the same building as before. The paper sorting facility will be established at a new location (not yet finally selected).
A joint contract will include both the sorting facility for residual waste and for paper.
Residual waste sorting plant:
A contract shall be entered into for the electromechanical turn-key delivery of sorting facilities for mixed residual waste from households.
Capacity: 40 tons/hour
The facility will sort out the following fractions:
- Mixed plastic
- Magnetic Metal
- Non-magnetic metal
- Tetra
- Possible options:
o Other options may be included
Paper sorting plant
Electromechanical turn-key delivery sorting plant for cardboard, paper, beverage carton
The facility will sort on the following fractions:
- cardboard/cardboard
- Reading material/newspapers/magazines
- Drinking carton
- Mixed cardboard/paper/carton