Assignment text
A contract for engineering design services shall be entered for the Light Rail, Construction stage 5, including rail engineering disciplines and cycle paths.
The fifth construction stage runs from the city centre through Åsane to Vågsbotn, together with a continual cycle route and an extension of the Fløyfjell tunnel to Eidsvåg.