Assignment text
The Scope of Supply shall comprise a complete high pressure system between the new wood chips fired boiler of 150 MW fuel input that is under construction and a new steam turbine unit that have just been purchased. The Supply includes high pressure piping from boiler to turbine and turbine bypass, drain and vents, etc. as stated in the Special Conditions. The Supply must be engineered, delivered, installed, cleaned, tested, commissioned and documented in accordance with the limits specified and be ready for hand over as stated in the Contract time schedule. When completed, the supply must be fit for the purposes for which the supply is intended as defined in the Tender Material.