Short description
The contest concerns the delivery of bio-gas turbines with an option for turbine no. 2, including installation and startup for Søndre Follo Treatment Plant IKS. Bio-gas turbines that will use bio-gas produced by the facility as fuel. The aim is that the turbines will produce power and heat water to a temperature of 86 degrees for internal use. The tenderer for this contract is responsible for the installation of all necessary equipment for plant that is ready for operation and well-functioning plant.
The contracting authority has budgeted the value of the procurement at: NOK 5.0 million – 5.5 million for the gas turbines. In addition, there is an option for a gas turbine no. 2. Which means that the delivery may be prepared for the assembly of gas turbine no. 2.
Analysis of the bio-gas will be carried out on an ongoing basis.