Short description
The contract includes the laying of transverse road marking. Including symbols and
thermoplastic text and longitudinal road marking with spray plastic, thermoplastic and paint.
The contract applies to the county roads in Agder.
It is expected that the annual scope is approx.:
- Extruded thermoplastic as transverse road marking; approx. 94 tonnes per annum.
Extruded thermoplastic as transverse road marking; approx. 453 km with line and
the scope is approx. 210 tonnes per annum.
Longitudinal road marking with spray plastic; 220 km with line. The scope is
approx. 68 tonnes per annum.
- Paint as longitudinal road marking; approx. 1,190 km with line. The scope is approx. 84 tonnes per annum.
The contracting period is two years (2023 and 2024) with an option for one year (2025) + one year (2026) extension.