Short description
The new E8 from Sørbotn to Laukslett is approx. 10 km long. Several minor constructions of bridges and culverts are to be constructed along the route.
Ramfjorden is to be crossed b y a beam bridge of approx. 870 m founded on steel pipe pillars. Avalanche protection is to be established in the form of two avalanche mounds along the road, and protection measures at avalanche rivers in the form of leading mounds and avalanche cones, as well as alterations to existing water supply/wells. There is an extraction area for solid rock in the southern part of the area around Sarastein. The existing avalanche mound is to be extended in the same area, as well as the establishment of an overpass for reindeer over the existing E8.