Assignment text
KS-1 The Hestnes tunnel. A turnkey contract that includes substructure works from Kleverud to Espa and construction of the Hestnes tunnel.
The works are divided in three lots, further described in Appendix A:
Day zone Kleverud (1.0 km)
The Hestnes tunnel (3.1 km)
Day zone at Espa (0.2 km) and Labbelva railway bridge (approx. 10 m)
The works are expected to start during Q4 2021. The works are planned to be completed during Q1 2026.