Assignment text
The contract includes the hire of a provisional construction bridge for transporting masses at Lysaker. More precisely a Mabey Universal carriageway bridge. Bridge length 45.127m and a width of carriageway 7.35m. Cantilever wakway with a width of 2m. The estimated contract period is 6 years and includes assembly/disassembly of the bridge. Foundation work, etc. is included in a different contract.