Short description
Extent: 195 constructions are to be inspected over the course of 1 year (2020), including 12 ferry quays that must have a main inspection.
The assignment includes registering damages in the bridge management programme BRUTUS, documentation of damages in the form of photos and video, as well as relevant sample taking, surveying, reports, and measures, etc. Attention is drawn to the fact that the number of bridges that must be inspected can vary from year to year.
Contract length:
The framework agreement will be valid for 1 year from when it is signed.
The contracting authority will have an option to extend the contract for 1 year, so that the total possible contract period is 2 years.