Assignment text
Mo i Rana — the expansion of an operating central and a new sterile central:
The work includes renovation of the current electric power supply and telecommunication installations in the operating department in the west wing of the first floor, as well as installations in the newly constructed S wing. The electro contract includes re-adjustment, disconnecting and demolition/disassembly of the technical installations in the areas subject to reconstruction work. A new backup power supply station as well as UPS with one electric main distributor each. in level U1 shall also be established.