Assignment text
The procurement includes cleaning and maintenance of stops, platforms, shelters, pavements and foot and cycle paths within the areas that Bybanen AS is responsible for, with the exception of the stop at Flesland. Pavements and foot and cycle paths make up approx. 4,8 km in construction stages 1 and 2.
The stretch is not continuous and is, amongst other things, split by tunnels, see the attached drawings. Bybanen AS is not responsible for the foot and cycle paths in construction Stage 3.