Short description
The Baltic Pipe project is connecting the Norwegian gas transmission system to the Danish transmission system by a subsea pipeline in the North Sea and then connecting to the Polish transmission system by a subsea pipeline in the Baltic Sea to facilitate the gas supply to Poland. As part of the Baltic Pipe project, an extension to the existing gas receiving terminal at Nybro Jutland Denmark must be carried out, which covers brownfield construction and installation works. At the terminal, the gas will be heated so the pressure can be reduced to accommodate the design pressure of the existing onshore pipelines approximately 163,4 barg to 80 barg. In addition to this, the gas will be filtered and the gas flow and the content of the gas will be measured.