Short description
4 generators must be delivered: 2 generators in the ground floor and 1 generator in the second floor.
The generators in the ground floor create redundant solutions for the ground and first floors. The redundant applies to the production, not to the distribution.
The ventilation plants must be a part of the refrigerating system by connecting to the baffle systems in the first floor. The systems that constitute the redundant solutions in the ground and first floors shall have relatively large capacity and conduits.
The generator in the second floor shall serve the second floor containing offices and social rooms. One standard installation.
All generators shall be developed with water-borne batteries for heating and refrigerating, and rotating exchangers.
See the tender documentation for a more detailed description.